What points to put meter on?
Sent from my SPH-L720 using Tapatalk
Battery ground?
Sent from my SPH-L720 using Tapatalk
At the battery while cranking. Then move positive to hot side of solenoid while cranking. Then move it to output side of solenoid while cranking and then to positive terminal on starter while cranking.
Post all your results.
Repairing and selling iPads, iPhones and Mini iPads.
[h=2][/h]Check from ground to the red wire going into the mpem, then crank
then try checking from the RED/ PUrple wire to ground.
The first one is power coming directly from the battery.
The second one is power coming out of the mpem going to all the accessories.